STEP 1
[login to view URL] meet one evening soon at an internet cafe in Gulbahar
2. I open the host (1and1) and ftp access and you back up a one page (probably 10MB max)website (and email box if you can) onto a cd (cd drive available)
3) You load up the back up onto a test node of your own somewhere to show it is functioning
STEP2
1) You migrate the domain, and website (and email box if possible) onto a different host (contabo)
STEP 3
1. Two days later you check to se the migration has been completed without hitch, and check the website and email box (if possible)
STEP1 is probably 10-120 minutes
STEP 2 is probably 60 minutes
STEP 3 is probably 60-120 minutes spread over 2- 3days
Hi i am a boğaziçi university student and i took courses about web design and i live in hisarüstü.i control my father's website and also i run different website projects. So that i might be the best choise for this job
$25 USD in 1 day
0.0 (0 reviews)
0.0
0.0
2 freelancers are bidding on average $28 USD for this job