Operations Research Code for Maximizing Output -- 2

Completed Posted 6 years ago Paid on delivery
Completed Paid on delivery

Taking into Consideration the following constraints,

Electrical Consumption,

Labor Available,

Resources Available (Raw Materials, Packaging Materials...)

Hours Available,

Desired outcome is to create a schedule, considering all the above constraints, especially a constrained electrical consumption, while taking into consideration the lead time of machinery, and cooling of products, while maximizing the total output of the industry.

The industry is a chocolate factory that has major constraints.

Industrial Engineering Manufacturing Design Project Scheduling

Project ID: #16035652

About the project

2 proposals Remote project Active 6 years ago

Awarded to:

rajeshkumararora

Hello – I am having a PhD in engineering from a top university and have 15 years’ experience in solving optimization problem. I will use EXCEL to solve your problem. I am highly qualified for this project and would li More

$111 USD in 3 days
(0 Reviews)
0.0