Operations Research Code for Maximizing Output -- 2
$30-250 USD
Paid on delivery
Taking into Consideration the following constraints,
Electrical Consumption,
Labor Available,
Resources Available (Raw Materials, Packaging Materials...)
Hours Available,
Desired outcome is to create a schedule, considering all the above constraints, especially a constrained electrical consumption, while taking into consideration the lead time of machinery, and cooling of products, while maximizing the total output of the industry.
The industry is a chocolate factory that has major constraints.
Project ID: #16035652
About the project
Awarded to:
Hello – I am having a PhD in engineering from a top university and have 15 years’ experience in solving optimization problem. I will use EXCEL to solve your problem. I am highly qualified for this project and would li More