Shipped 10 days from spec finalisation
Deliverables:
* 2 working prototype pcb assemblies
(microprocessor socketed)
* BOM, Schematic, PCB Drgs (Gerber)
* commented micro source code
Notes: Valve current, timer time,switch
type and connector types have to
be specified.